The River at Parkway Station Garden City, ID

This vertical mixed-use development is composed of multifamily units (one-bedroom, two-bedroom units and three-bedroom).

Project Details

Units:

70 residential units

Square Feet:
79,270
Construction Length:
14 months
Long Term Financing:
65% Loan to Value Max
Estimated Total Cost:
$20.3MM
Target IRR:
27.34%